Civil Engineering Works, Battery Energy Storage Systems (BESS)

Andrew Scott Ltd is technical partners to Aldustria a company fast establishing a diverse portfolio of battery storage facilities across Southern England and South Wales at various stages of development, delivery and operation.
These include their core product of grid-connected projects ranging in capacity from 3MW to 30MW.
The civil engineering works for the BESS sites typically include:
Site Preparation and Enabling Works
Design and Construction of foundations and bases
Drainage and Surface Water Management
Access routes and Hardstanding
Fencing and Security Infrastructure
Cable Routing and Ducting
Utility and Service Connections
This scope ensures a robust and compliant site compound and civil foundation to support the electrical and mechanical installation of the BESS, with careful consideration of safety, environmental impact, and long-term use.