2020

Staff and company workforce at Margam Park

2020

New build construction of a large, state of the art, hospice facility. The new hospice, set over eight acres of land, will include an patient day unit, medical facilities, offices, cafe, library and education and community facilities. The hospice will also include 28 ensuite in-patient rooms. As Principal Contractor we are also undertaking all associated site infrastructure works including drainage, …

2019

New build and civil engineering works for a new in-land surfing destination. The technically challenging and complex civil engineering works includes a 200m surfing lake with the installation of Wavegarden technology that provides 1000 waves an hour. Alongside the surfing lake we have constructed a new visitor and education centre and clubhouse to Passivhaus standards.

2019

In May 2019, our team undertook the important task of relocating Banksy’s ‘Season’s Greetings’ from a garage in Port Talbot, to its new home at Ty’r Orsaf.

2018

This project consisted 2 storeys rc frame 10m below ground level with associated storm and foul service diversions which are 3m-8m deep adjacent to existing buildings and roadways, with unrestricted flow requirements.

2018

Extensive redevelopment of an industrial manufacturing facility in Cardiff. The completed scheme will increase the existing area from 10,996m2 to 20,485m2, enabling the client to increase production. Works have involved demolition of existing buildings, while keeping other buildings operational 24/7. New build construction works are being completed in two phases, phase one complete and phase two due for completion Spring …

2017

As Principal Contractor we constructed the 4m wide, 50m long Y-shaped bridge over the river Avon in Bristol designed by Knight Architects. Designed to accommodate the height difference between two riverbanks, one branch is connected to an elevated concrete ramp whilst the other branch carries a pedestrian staircase down to a pedestrian footpath.

2016

Construction of a unique curved bridge, topped with timber decking, culptured cladding and feature lighting. The bridge’s piled foundations, concrete structure and 20-tonne steel sections were all placed via ‘jack-up’ barges and floating pontoons. Castle Bridge is an integral part of the Finzels Reach development, linking the Floating Harbour to the city centre. ICE ‘Designed in Wales 2018’ winner.

2016

The new Transport Hub centralises main transport links including Port Talbot Parkway station, a new bus terminal, cycle facilities, a taxi rank and drop-off and pick-up bays in a largely pedestrianised concourse, providing easier access to employment and residential areas in and around the town.

2016

This project created a 15-bedroom facility for St David’s Care in Newport. Each room provides patients an en-suite facility and private terrace.