2015

Extensive infrastructure and enabling works along with the construction of a mixed used development of seven high quality food and non-food units. Tenants include Frankie and Benny’s and Chiquito, DFS, Next and Asda.

2014

Sandhurst is a small exclusive development built specifically for the over 55’s. High quality specification and contemporary architecture have been combined to create tranquil beach front living accommodation that maximises the spectacular views. The scheme has a low carbon footprint, due to its orientation and the use of superinsulated materials with high acoustic performance.

2014

A two-phase design-and-build 21st century school. Phase 1: New two-storey teaching block and sports hall. Phase 2: Refurbishment of the existing school and the construction of new playing fields. The sports provision included a grass rugby pitch, junior grass pitch, 3G pitch, MUGA, cricket wicket, athletics long jump with pit and throwing circle. The school also includes a county-standard sports hall.

2013

A scheduled ancient monument which includes Grade I and II listed walls, the Regency Manor House and ancillary buildings. Phase 1: wall repair works. Phase 2: building restoration, repairs and conservation works comprised traditional carpentry, roofing, lime mortar and plaster.

2010

Purpose-built for the 2010 Ryder Cup, the two-storey golf clubhouse is a fitting venue to host one of the world’s top golf events. Features of the clubhouse include a gated entrance, bar and restaurant, a private members lounge, luxury locker rooms with open fires and additional lounge areas, a pro-shop, and spike bar. The scheme achieved the Wales LABC Award …

2008

Design & construct of a 15,000-seat stadium. The mains stand contains restaurants, corporate hospitality areas, conference space and office accommodation. The project also included the construction of a separate training barn, offering indoor training facilities, and an additional training pitch and sports track.

2003

We undertook the civil engineering works for the project at the steel works site in Port Talbot which comprised some 6,000 tonnes of steel and 140,000-man hours. Our additional works included repairs to three hot blast stoves, inhaul conveyor systems and high-level bunkers. A new gas plant, fume extraction plant and closed-circuit water-cooling system were also installed. The furnace was …

1997

Multiple projects undertaken with the BOC Plant in Margam, including refurbishment and extensions.

1993

This commercial development in the centre of Swansea provided much needed office space to reflect the growing needs of the City.

1979

This contract involved stripping the natural vegetation off an area of fields and excavating in order to build a 6 million gallon reservoir. It was built on reinforced concrete foundations with mass concrete walls 26’ high and 11’ thick at the base tapering to a 2’ thickness at the top. The roof of the reservoir was a reinforced concrete slab …