Construction of a unique curved bridge, topped with timber decking, culptured cladding and feature lighting. The bridge’s piled foundations, concrete structure and 20-tonne steel sections were all placed via ‘jack-up’ barges and floating pontoons. Castle Bridge is an integral part of the Finzels Reach development, linking the Floating Harbour to the city centre. ICE ‘Designed in Wales 2018’ winner.
![](https://i0.wp.com/www.andrewscott.co.uk/wp-content/uploads/2021/10/2016-3.jpg?fit=512%2C341&ssl=1)
![](https://i0.wp.com/www.andrewscott.co.uk/wp-content/uploads/2021/10/2016-3.jpg?fit=512%2C341&ssl=1)