Process & Utilities
We have a proven track record of success in the process, manufacturing, utility and energy sectors throughout the UK.
We understand the sensitivity of working in COMAH (Control of Major Accident Hazards) regulated sites where safety is always the top priority.
We are a Tier 1 Framework Contractor to Western Power Distribution and Wales & West Utilities delivering civil and building projects. We also work as an approved contractor for Welsh Water.
Our project teams have the technical skills, knowledge, training and experience to ensure we deliver a reliable quality service to our clients on a ‘right-first-time’ basis, thereby securing repeat business through trusted working relationships.
Concast Building houses continuous casting machines for the production of 234 mm thick by 850-1600 mm wide steel slabs
Building & Civil Engineering Works
Upper Tier COMAH* Site
*Pending Approved Image
RE-LIQUEFACTION PROJECT Dragon LNG (Liquified Natural Gas) Dragon LNG has invested in a reliquefaction plant (RP) project. The civils and buildings contract comprised; site surveying and preparation, the completion of all civil works, foundations for permanent works, erection of buildings, leveling. Backfilling and grading, underground work and infrastructure works.
|
Single-source Framework
Live production site
£7.7m (to date)
MULTIPLE CONTRACTS The Royal Mint Since 2004, we have delivered a wide range for capital investment projects for the Royal Mint, and in 2010 we entered into a long-standing single source framework agreement. To date we have successfully completed the following new build and refurbishment projects: Chemical Storage Building. Design & Build contract creating a new building to house highly sensitive chemicals. The building also became a central ‘hub’ for the Emergency Services. Armour 1 & 2 Nickel Plating Line Buildings. Design and build scheme modifying and expanding an existing steel frame building.
|
Single-source Framework
Live production site
£7.7m (to date)
MULTIPLE CONTRACTS The Royal Mint (Cont) Effluent Plant. Design and build contract creating a two-storey steel frame building, on piled foundations, with a reinforced concrete slab and insulated cladding. Welfare Facilities. Modernisation of staff areas, locker rooms, shower facilities and WC’s at 14 locations throughout the ‘live’ estate. CRP Office & Despatch Area. Complete refurbishment and modernisation of a redundant office, under a design and build contract. Long / Coin Store. Design and build contract creating a new 100m long building around the existing store. Factory Experience. Creation of an interactive and educational visitor experience.
|
Long-term Construction Partner
Live process environment
£9.1m (to date)
MULTIPLE CONTRACTS Anheuser-Busch InBev UK Since 2014, we have delivered a wide range for capital investment projects for ABInBev, the UK’s largest brewing company. Projects include; new build, refurbishment and modernisation projects. Project Galileo Phase 1 – Warehouse. Design & Build contract creating 4375m2 of industrial space.
|
Long-term Construction Partner
Live process environment
£9.1m (to date)
MULTIPLE CONTRACTS Anheuser-Busch InBev UK (Cont) Project Galileo Phase 2 – Storage & Distribution Centre. Design & Build contract creating 9,472m2 of industrial space. Pasteurising Building Extension. Design & Build contact creating a new building between the bottling and kegging areas Conversion Vessels Area. Design & Build contract installing foundation bases for two new conversion vessels.
|
Long-standing construction partnership
Complete capital works programme
£40m (to date)
MULTIPLE CONTRACTS Tata Steel Europe Concast No.3. Works associated with the construction of casting Blast Furnace No. 4 Break out of refectory concrete to enable demolition Blast Furnace No. 5 The repairs to three hot blast stoves, inhaul conveyor systems and high level bunkers. The furnace was completely rebuilt and operational in 9 months.
|
Major expansion of production facilities
Live production site
£4.5m
PEAK POWDER PLANT Victrex plc Victrex are a British-based supplier of high performance polymer solutions. We undertook the construction of a new Peak Powder Plant at their Fleetwood site. Works included; groundworks, rc foundations, drainage, underground services, rc effluent pits, access road, footpaths and the main production building and smaller ancillary buildings Additional works included the construction of several ancillary buildings and associated services and drainage.
|
Major expansion of production facilities
Live production site
£9.0m
MULTIPLE CONTRACTS Bridgnorth Aluminium Ltd Mill Foundations Civil engineering works to create a reinforced concrete basement structure & foundations. Rolling Mill Construction of a new 20mx45mx9m deep basement incorporating suspended slabs. Finishing Line Raft foundation, sheet piled cofferdam to construct Cold Rolling Mill basement, steel frame and blockwork buildings.
|
Tier 1 Contractor
Projects in safety critical environments
£4.5m
FRAMEWORK AGREEMENTS Western Power Distribution For over 15-years we have been a Tier 1 Framework Contractor, delivering civil and building projects within high-voltage environments, throughout Wales and SW-England. Works comprise; new substations, flood defences, emergency repairs, planned and reactive maintenance. All projects are managed to a high standard of health, safety and environmental protection.
|