Work comprised the building of the new North Stand, which has since been integrated into the world-famous Principality Stadium. The heavy reinforced concrete foundations were built in difficult conditions, the massive structure was of reinforced concrete with a plastic-coated steel clad cantilevered roof.
![](https://i0.wp.com/www.andrewscott.co.uk/wp-content/uploads/2020/02/cardiff-arms-park.jpg?fit=1063%2C676&ssl=1)
![](https://i0.wp.com/www.andrewscott.co.uk/wp-content/uploads/2020/02/cardiff-arms-park.jpg?fit=1063%2C676&ssl=1)