MUSTANG MARINE DRY DOCK BUILdiNG



New Build
£15m
First in the UK
Surf Bristol Ltd

Construction of a 200m inland Surf Lake using ground-breaking Wavegarden cove technology – the first of its kind in the UK. This exciting facility will generate up to 1,000 quality waves per hours, ranging from 50cm (1.7ft) to almost 2m (6.5ft) in height.

The new build also includes an education centre for schools and colleges, a café and bar, a surf shop. There’s also external works for landscaped gardens and car parks

client - bdc contracts (mh) ltd

value - £1.5m

duration - 14.5 weeks

part of a local enterprise zone

Engineer - John Brailsford

Surveyor - Banks Wood

Construction of a new dry dock fabrication building for the maintenance and repair of working boats, pilot boats, passenger and commercial vessels.

The building is fitted with multiple overhead gantry cranes each of six-tonne capacity and suitable for continuous operation moving and positioning prefabricated boat sections, engines and machinery.