ATLANTIC SHED
CLIENT - ASSOCIATED BRITISH PORTS (ABP)
VALUE - £2.6M
DURATION - 36 WEEKS
Principal Contractor Service since 2007
Engineer - Bingham Hall
The design and refurbishment of a 7,200 square metres, gantry crane transit building.
The project included; new structural steelwork including the foundations for the new ganty crane, new doors and the construction of a new gable end.
The building’s existing structural steelwork was repaired and fully re-clad and insulated.
The existing floor slab was repaired and overlayed.
Two new 30t and one 20t gantry cranes were installed.
Project Images